CS-3200 High-Hardness Floor Protectant

CS-3200 High-Hardness Floor Protectant

Single-component water-based eco-friendly floor protectant. Utilizes advanced nano-composite technology to form a dense protective layer that effectively shields against moisture, oil stains, and chemical damage. Suitable for protecting various substrate surfaces, delivering long-lasting shine and protection.

Terrazzo flooringFloor GrindingTilesStonePVC flooringEpoxy flooring
Get a Quote

Application Effect Showcase

App Effect 1
App Effect 2

Technical Specifications

Authoritative Test Report

Testing Agency: Quality Supervision and Inspection Center for Aging of Chemical Synthetic Materials (Guangzhou Aging Institute)
Report No. TL26040110 | Testing Period: 2026/3/4 to 2026/4/1

CS-3200 Test Report - Test Items and Results
Pencil Hardness6H (GB/T 6739-2022)
Heat resistance300°C for 1 hour: no bubbling, wrinkling, or cracking (GB/T 1735-2009)
Dry Coefficient of Friction0.63 (GB/T 4100-2015)
Slip Coefficient (Wet Method)0.63 (GB/T 4100-2015)
Liquid medium resistance (8h 16)Saturated NaCl solution, MEK, and IPA: no issues after 16 hours at 8h (GB/T 9274-1988).
Boiling water resistance test3-hour bubble-free, wrinkle-free, and crack-free (GB/T 1733-1993)
Durability0.001g (CS-10, 500g, 500r, GB/T 1768-2006)
Low-temperature test-20℃, no bubbling, wrinkling, or cracking after 8h (GB/T 2423.1-2008)
Impact Resistance50 cm (GB/T 1732-2020)
Adhesion0 Grade (2a-spacing 1mm, GB/T 9286-2021)
Paint Film AppearanceThe coating is smooth and even, with no abnormalities (GB/T 1727-2021).
Fire RatingGB 30981.1-2025 Class A Fire Resistant

Construction Process

01

Thoroughly clean the floor to remove oil, grease, dust, and loose debris. Use a grinder to finely sand the surface for a smooth, clean finish.

For detailed construction methods, please contact our Technical Application Department.

02

Apply a uniform coat of primer to enhance adhesion.

For detailed construction methods, please contact our Technical Application Department.

03

Apply CS-3200 protective coating by roller or spray, using a cross-hatch application method.

For detailed construction methods, please contact our Technical Application Department.

04

Cure naturally for 24-48 hours. Do not walk on the surface during this period.

For detailed construction methods, please contact our Technical Application Department.

Important Notes

Construction Safety and Quality Control

  • Construction ambient temperature should be between 5-35°C, with relative humidity ≤85%.
  • Do not install during rain, snow, or high winds.
  • Ensure substrate moisture content is ≤8% before construction.
  • Use promptly after opening. Seal tightly if not fully used.
  • Wear protective gloves and a mask during installation; ensure adequate ventilation.
  • If it gets in your eyes, rinse immediately with clean water and seek medical attention.
  • Keep out of reach of children
  • Dispose of packaging in accordance with local environmental regulations.

Maintenance Guide

For daily cleaning, use a soft mop or vacuum cleaner.
For stubborn stains, wipe with a diluted neutral cleaner.
Do not clean with strong acids, strong alkalis, or organic solvents.
Recommended maintenance every 6-12 months
Use protective pads when moving heavy items to prevent scratches.

Need professional construction services?

We provide professional flooring installation teams to ensure optimal results.

Contact our expert team
Yue ICP Bei 2026083397 Hao-1