CS-2000C Ultra-Durable Floor Stain

CS-2000C Ultra-Durable Floor Stain

A and B two-component reactive ultra-wear floor stain using isocyanate curing technology to form a dense cross-linked network. Delivers exceptional abrasion resistance, impact resistance, and flexibility, engineered for high-load environments such as warehouses and production floors. Meets GB/T 22374-2018 "Floor Coating Materials" standards.

Logistics and Warehousing CenterUnderground GarageProduction WorkshopFood Processing PlantHeavy Machinery Manufacturing PlantParking
Get a Quote

Application Effect Showcase

App Effect 1
App Effect 2

Technical Specifications

Authoritative Test Report

Testing Agency: Quality Supervision and Inspection Center for Aging of Chemical Synthetic Materials (Guangzhou Aging Institute)
Report No. TL26040110 | Testing Period: 2026/3/4 to 2026/4/1

CS-3200 Test Report - Test Items and Results
AppearanceMulti-color Viscous Liquid
RatioA:B = 1:1 (by weight)
Solid Content≥95%
Density1.35±0.05 g/cm³
Theoretical Usage0.15-0.2 kg/m² (thickness 0.3-0.5mm)
Probation period≥40 minutes (25°C)
Drying timeSurface dry: 6-8 hours, fully cured: 72 hours
Pencil Hardness≥4H
Durability≤0.015g (GB/T 1768)
Impact Resistance80kg·cm, no cracks
Tensile Strength≥25 MPa
Elongation at Break≥80%
Bond Strength≥3.0 MPa
Load Capacity5-ton forklift moved normally without indentations
Liquid medium resistance (8h 16)Resistant to gasoline, diesel, and lubricating oil
Temperature resistance-50℃~+150℃
Expiration dateGroup A: 12 months, Group B: 6 months

Construction Process

01

Shot blasting to Sa2.5 grade, roughness 40-70 μm.

Use a shot blasting machine to treat the concrete surface, removing laitance and weak layers to create a uniform rough texture. After vacuum cleaning, apply a primer.

02

Roll-applied epoxy penetrating primer to seal the substrate.

Apply 0.15-0.2 kg/m² to achieve a penetration depth of ≥2mm. Allow to dry for 12-24 hours until touch-dry.

03

Mix components A and B in the specified ratio, then let cure for 10 minutes.

Mix with an electric mixer for 3-5 minutes until the color is uniform. Let it rest and cure for 10 minutes before use. Must be used within 40 minutes.

04

Apply with a trowel, controlling thickness to 0.3-{1.5}mm.

Apply in two coats: first, press the material firmly into the substrate; second, smooth the surface. Coverage: 0.15-0.2 kg/m². Drying time between coats: 12-24 hours.

05

Maintain sealed curing for at least 72 hours.

Do not allow personnel entry for 24 hours after application. Avoid heavy loads for 72 hours. Full curing and optimal performance are achieved in 7 days.

Important Notes

Construction Safety and Quality Control

  • Use within the specified validity period.
  • Construction temperature: 10-35°C, humidity ≤75%
  • Construction prohibited during rain or snow.
  • Open flames are strictly prohibited on the construction site.
  • Operators must wear protective clothing and respirators.
  • Store Groups A and B separately, away from heat sources.
  • Do not expose uncured materials to water.
  • For large-scale projects, proceed in sections.

Maintenance Guide

Avoid heavy loads for 7 days after installation.
Use a soft broom for daily cleaning.
Clean grease stains immediately with a neutral detergent.
Regularly inspect the forklift travel area for wear.
Repair scratches or damage promptly
Avoid parking heavy vehicles for extended periods.

Need professional construction services?

We provide professional flooring installation teams to ensure optimal results.

Contact our expert team
Yue ICP Bei 2026083397 Hao-1